Installation Best Practices

Guidelines for proper tank receiving, inspection, and installation.

Proper receiving and installation is critical to tank performance and longevity.

Upon Receiving

- Inspect tank for shipping damage before accepting delivery - Document any visible damage with photographs - Report damage to carrier and Tank Systems immediately - Verify all fittings and accessories are included

Site Preparation

- Ensure a level, stable foundation - Foundation should support the full weight of the tank when filled - Allow adequate clearance for maintenance access - Verify compliance with local codes and setback requirements

Installation Guidelines

- Follow manufacturer specifications for support requirements - Elliptical tanks require full-length bottom support - Vertical tanks over a certain height may require seismic restraints - Ensure proper venting per tank specifications - Test all connections before filling

Piping Connections

- Use flexible connections to accommodate tank expansion - Never force rigid piping connections - Support all piping independently from the tank - Use compatible gasket materials

Contact our team for installation assistance and specific guidelines for your tank model.

Need Technical Assistance?

Our team is ready to help with material selection, system design, and specifications.